Lammas Day CAL: Part 3 – Bringing in the Wheat

Edited: Correction made to row 119 (7 October 2021)

Can you believe it’s nearly the end of August? I suppose the summer can be a busy time which makes the weeks fly by, and it means it’s time for Week 3 of the Lammas Day Crochet-Along.

If you are brand new to the CAL you can find all the information you need on the CAL landing page, where I’ll link all the CAL posts in one place as I add them here to the blog. If you want to join in the CAL using the same yarn I did I have put together a list of stockists on a previous post.  

During the duration of the CAL this pattern will be released part by part here on the blog, after the full CAL has finished there will be a FREE PDF ebooklet available on the Anchor Crafts website (link to follow).

I hope you are ready to start Part 3 where we will continue our triangular shape as we plough another field and start to watch our spikes of wheat become heavy with their ears of grain.

Lammas Day CAL: Part 3 – Bringing in the Wheat

Yarn: Anchor Organic Cotton (4ply)

The amount listed below is the amount required to make the whole Lammas Day Shawl

  • 5 x 50g / 125 m Organic Cotton: 00105 (Natural) – YARN A
  • 1 x 50g / 125 m Organic Cotton: 00178 (Sunflower) – YARN B
  • 2 x 50g / 125 m Organic Cotton: 00103 (Rocky Orange) – YARN C
  • 2 x 50g / 125 m Organic Cotton: 00338 (Red Dunes) – YARN D
  • 1 x 50g / 125 m Organic Cotton: 00038 (Earthy Brown) – YARN E

Hook: You will need a 3.75mm (US size F/5) for this shawl. I have hooks, and other useful crochet tools, linked in my Amazon Store if this is something you need.

You will also need: Scissors, A yarn needle and stitch markers (mine were from Mrs G Makes).

Gauge: 5htr = 2.5cm (1inch). Gauge is not critical for this design, with each part I will provide the size of my work. If your gauge does not meet mine it will just mean you will end up with a bigger or smaller shawl and will possibly use more or less yarn than quoted as a consequence. If you wish to match my gauge you might try going up a hook size if your tension is quite tight, or going down a hook size if your tension is looser.

Finished Size:  

If you need a reminder of the shawl schematic you can find it on the CAL Planning post.

The pattern below is in UK Terms:

ABBREVIATIONS

  • RS                   Right Side
  • cm                   Centimetre
  • ch                    Chain
  • sp                    Space
  • st(s)                 Stitch(es)

STITCH GUIDANCE

  • Half Treble (htr): Yarn over, insert hook in indicated st and pull up a loop (three loops on hook), yarn over, pull through all three loops on hook.
  • Treble (tr): Yarn over, insert hook in  indicated st and pull up a loop (three loops on hook), yarn over, pull through two loops, yarn over, pull through remaining two loops on hook.
  • Spike Stitch (SPtr): A Spike treble st is a treble in the stitch directly in the row below;  yarn over, insert hook in top of the stitch 1 row below, yarn over, pull to height of working row, (three loops on hook), complete treble stitch as normal (e.g. yarn over, pull through 2 loops, yarn over, pull through two loops).
  • Grain St (Grst): [1 puff st, ch3, 1 puff st] in the same stitch
  • Puff St: Yarn over and insert your hook into the specified stitch/space.  Yarn over again and pull up a long loop.  (Yarn over and insert your hook into the same stitch/space.  Yarn over again and pull up a long loop) once more.  Yarn over and pull through all 7 loops on your hook.  Ch 1 to close the Puff Stitch (the ch1 does not count in the st count).

PATTERN NOTES

  • This pattern is for a triangular shawl that will now decrease with each row; decreases are made on one side only.
  • Add a stitch marker on the decrease side, moving it onto the row as you work to help mark decrease side.
  • You may also find it useful to add a stitch marker in the first stitch and the last stitch of each row.
  • Check st counts at the end of each row to keep on track
  • Keep any turning ch’s on the start of each row fairly loose so it doesn’t pull your work too tightly

CHART STITCH LEGEND

PATTERN – PART 3

Attach YARN A to the top of the first st of row 97 worked of part 2;

Notes:

  • The ch1 at the start of each row does not count as a st.
  • Work the SPtr’s into the middle tr of the 3tr’s of the previous row;

Row 98: (RS): Ch1, 1htr in the same st, htr2tog, 1htr in the next 2sts, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat twenty-one times across the row, 1htr in the last 2sts, turn. 95sts

Row 99: Ch1, 1htr in each st until the last 3sts, htr2tog, 1htr in the last st, turn. 94sts

Row 100: Ch1, 1htr in the first st, htr2tog, 1htr in each st across, turn. 93sts

Fasten off YARN A and weave in ends; attach YARN D to the top of the last st worked;

Row 101: Ch1, 1htr in the next 4st, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat twenty times across the row, 1htr in the next st, htr2tog, 1htr in the last st, turn. 92sts

Rows 102 – 103: Repeat row 100 and 99, turn. 91 / 90sts

Fasten off YARN D and weave in ends. Attach YARN A to the top of the last st worked;

Row 104: Ch1, 1htr in the next st, htr2tog, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat twenty times across the row, 1htr in the last 2sts, turn. 89sts

Rows 105 – 106: Repeat rows 99 – 100, turn. 88 / 87sts

Fasten off YARN A and weave in ends. Attach YARN D to the top of the last st worked;

Row 107: Ch1, 1htr in the next 4st, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat eighteen times across the row, 1htr in the next 3sts, htr2tog, 1htr in the last st, turn. 86sts

Rows 108 – 109: Repeat rows 100 – 99, turn. 85 / 84sts

Fasten off YARN D and weave in ends. Attach YARN A to the top of the last st worked;

Row 110: Ch1, 1htr in the next st, htr2tog, 1htr in the next 2sts, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat eighteen times across the row, 1htr in the last 2sts, turn. 83sts

Rows 111 – 112: Repeat rows 99 – 100, turn. 82 / 81sts

Fasten off YARN A and weave in ends. Attach YARN D to the top of the last st worked;

Row 113: Ch1, 1htr in the next 4st, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat sixteen times across the row, 1htr in the next 5sts, htr2tog, 1htr in the last st, turn. 80sts

Rows 114 – 115: Repeat rows 100 – 99, turn. 79 / 78sts

Fasten off YARN D and weave in ends. Attach YARN A to the top of the last st worked;

Row 116: Ch1, 1htr in the first st, htr2tog, SPtr in the next st, (1htr in 3sts, SPtr in the next st), repeat seventeen times across the row, 1htr in the last 2sts, turn. 77sts

Rows 117 – 118: Repeat rows 99 – 100, turn. 76 / 75sts

Fasten off YARN A and weave in ends

Please note in the chart below there are more repeats than shown:

Attach YARN D to the top of the last st worked;

The next panel of the shawl will be worked in a repeating five row stitch pattern;

Note: In the pattern where it says to work into the next ch3-sp, this is the space in the middle of the Grst

Row 119 (WS): Ch1, 1tr in the next 2sts, (miss 2sts, Grst, miss 2sts, 1tr in the next 3sts) repeat seven more times across the row, Grst once more, 1tr in the next st, tr2tog, 1tr in the last st, turn. (9 Grsts, 29tr)

Row 120: Ch1, 1tr in the next st, tr2tog, (Grst in the ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat seven more times across the row, Grst in the ch3-sp once more, 1tr in the last 2sts, turn. (9 Grsts, 28tr)

Row 121: Ch1, 1tr in the next 2sts, (Grst in the ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat seven more times across the row, Grst in the ch3-sp once more, tr2tog, turn. (9 Grsts, 27tr)

Row 122: Ch1, tr2tog, 4tr on top of the next ch3-sp, 1tr on top of the 3tr’s of the previous row, (5tr on top of the next ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat six more times across the row, 5tr on top of the next ch3-sp, 1tr on top of the last 2tr’s of the previous row, turn. 71sts

Row 123: Ch1, 1tr in each st along until the last 3sts, tr2tog, 1tr in the last st, turn. 70sts

Row 124: Ch1, 1tr in the next st, tr2tog, 1tr in the next 4sts, (Grst, 1tr in the next 3sts) repeat six more times across the row, Grst once more, 1tr in the last 2sts, turn. (8 Grsts, 29tr)

Row 125: Ch1, 1tr in the next 2sts, (Grst in the ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat seven more times across the row, tr2tog,1tr in the last st, turn. (8 Grsts, 28tr)

Row 126: Ch1, 1tr in the next st, tr2tog, 1tr in the next 2sts, (Grst, 1tr on top of the 3tr’s of the previous row) repeat six more times across the row, Grst once more, 1tr in the last 2sts, turn. (8 Grsts, 27tr)

Row 127: Ch1, 1tr in the next 2sts, (5tr on top of the next ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat six more times across the row, 5tr on top of the next ch3-sp, 1tr on top of the next 1tr’s of the previous row, tr2tog. 1tr in the last st, turn. 66sts

Row 128: Ch1, 1tr in the next st, tr2tog, 1tr in each st across the row, turn. 65sts

Row 129: Ch1, 1tr in the next 2sts, (miss 2sts, Grst, miss 2sts, 1tr in the next 3sts) repeat six more times across the row, 1tr in the next 4sts, tr2tog, 1tr in the last st, turn. (7 Grsts, 29tr)

Row 130: Ch1, 1tr in the next st, tr2tog, 1tr in the next 6sts, (Grst, 1tr on top of the 3tr’s of the previous row) repeat five more times across the row, Grst once more, 1tr in the last 2sts, turn. (7 Grsts, 28tr)

Row 131: Ch1, 1tr in the next 2sts, (Grst in the ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat six more times across the row,1tr in the next 2sts, tr2tog,1tr in the last st, turn. (6 Grsts, 27tr)

Row 132: Ch1, 1tr in the next st, tr2tog, 1tr in the next 4sts, (5tr on top of the next ch3-sp, 1tr on top of the 3tr’s of the previous row) repeat five more times across the row, 5tr on top of the next ch3-sp, 1tr on top of the last 2tr’s of the previous row, turn. 61sts

Row 133: Ch1, 1tr in each st along until the last 3sts, tr2tog, 1tr in the last st, turn. 60sts. Fasten off and weave in ends.

Please note in the chart below there are more repeats than shown:

Video Tutorial:

Click on the image below to be taken to a helpful video tutorial for this section …

Or alternatively find on Youtube here.

And that’s it! Part 3 completed! We will be continuing with our decreases next week to finish off our shawl.

The Schedule, Updates & Support:

As always if you need a reminder of the schedule then you can find the details on the CAL landing page (here) and you can keep up to date with the CAL details and get support if needed via the following links:

The hashtags for this CAL are #LammasDayCAL #proud2craft #anchorcrafting and #kcacouk for Twitter and Instagram. We would also love it if you can tag KCACO.UK and AnchorCrafting on Instagram so we don’t miss your posts!

You can also join in with any progress photos by linking your projects on your favourite social media sites: RavelryFacebook page or Facebook group and Pinterest; re-pin from this board here.

 Save the project to your favourites on Ravelry 

Thank you for crocheting along with me!

Until next time; keep calm and crochet on my friends xx

Wordpress-Signature.jpg

Please note that some of the links in my blog are affiliate links. I may earn a small commission if you purchase via these links, but the price you pay is not affectedYou can read more about my affiliate links here.


Leave a Reply